Civil Engineering Interview Cheat Sheet: 20 Technical Questions Freshers Get Asked
Written by
The Cheat School Team
Published
October 22, 2026
Reading time
2 min read
Interviewers for site and junior design roles ask the same core questions again and again. Know these answers cold, then add an example from a project you actually worked on.
Concrete
- What does M20 mean? Concrete with a characteristic compressive strength of 20 N/mm² at 28 days. A nominal mix for M20 is 1 : 1.5 : 3 (cement : sand : aggregate).
- What is a slump test? A site test for workability of fresh concrete, measured as the drop in height of a concrete cone.
- Why do we cure concrete? To keep moisture available so cement hydrates fully and the concrete reaches its strength. Typical curing is at least 7 days for ordinary Portland cement.
- Initial and final setting time of OPC? Initial not less than 30 minutes, final not more than 600 minutes (10 hours).
- Standard size of a concrete cube for testing? 150 mm x 150 mm x 150 mm.
Structures
- One way slab or two way slab? If the longer span divided by the shorter span is more than 2, it is a one way slab.
- Why is clear cover provided? To protect reinforcement from corrosion and fire, and to ensure bond with concrete.
- What is development length? The length of bar needed inside concrete to transfer its stress through bond.
- Where are laps avoided in beams? At points of maximum bending moment, such as midspan for bottom bars.
- What is a cantilever beam? A beam fixed at one end and free at the other.
Site and materials
- Standard modular brick size in India? 190 x 90 x 90 mm (200 x 100 x 100 mm with mortar).
- Weight of one bag of cement? 50 kg.
- Density of steel? About 7850 kg/m³.
- What is bulking of sand? Increase in volume of damp sand, which affects volume batching.
- What is a DPC? Damp proof course, a layer that stops moisture rising through walls.
Project management
- What is the critical path? The longest sequence of dependent activities; it sets the project duration.
- What is float? How much an activity can be delayed without delaying the project.
- What is a BOQ? A list of all work items with quantities and units, used for pricing.
- What is a DPR? A daily progress report recording work done, labour, materials and issues.
- What is the difference between estimate and tender? An estimate is the owner's expected cost; a tender is a contractor's priced offer.
Cheat code: Answer, then prove. Follow every definition with one sentence like 'On my 2BHK project I checked slump before every pour'. That is what separates you from 200 other freshers.
Mock interviews and 1:1 communication coaching are built into every Cheat School program.